by Stuart Ginbey | Aug 22, 2016
by Stuart Ginbey | Jun 20, 2016
The accommodations air conditioning system has been short cycling and it was evident that it was short of refrigerant. We removed all refrigerant from both systems and fully pressure tested each circuit. At the same time we completed a full service by replacing the...
by Stuart Ginbey | Apr 20, 2016
AHU Replacement FEED Study The North Alwyn platform has been experiencing significantly high pressurization problems throughout the living quarters. During our offshore survey visit, we were able to resolve the pressurization issues which have been a concern for quite...
by Stuart Ginbey | Apr 20, 2016
We carried out an offshore survey of x4 chill rooms and x3 freezer rooms to recommend a solution to upgrading the equipment. We then provided a proposal to supply and install ATEX rated refrigeration equipment.
by Stuart Ginbey | Apr 20, 2016
The SCR room air conditioning units were in poor condition with a variety of faults and failures. This caused the main distribution panels to shut down and it was critical that these systems were repaired immediately. We received an emergency callout to the Ensco 70...