by Stuart Ginbey | Apr 20, 2016
During major drilling operations, the SCR room overheats due to increased electrical load on the cabinets and not enough cooling capacity on the originally installed AC units. We were invited to complete a detailed Heat Load Analysis prior to installation of new air...
by Stuart Ginbey | Jan 20, 2016
Following a recent survey, it was discovered that there was not enough cooling capacity in the SCR Room and especially during major drilling operations. We supplied and installed x3 twin circuit air conditioning systems which now provides plenty of redundancy with x6...
by Stuart Ginbey | Jun 22, 2015
by Stuart Ginbey | Apr 20, 2015
Our HVAC Engineer was sent to Singapore to join the second leg of the voyage on board the FPSO Dalia. Our role was to commission the DX refrigerated cooling systems for the Electrical Substations and advise the Siemens PLC technician on the correct operating strategy...
by Stuart Ginbey | Apr 20, 2015
The main galley freezer room compressor had failed causing a major loss of product. We received an emergency callout to the Ensco 80 and mobilized immediately. The system was repaired enough to maintain operation however a new compressor was required. Due to the...